SX-1940 One Way Perforated

What temperature is required for installation? How long does the window need to stay in that temperature range?

Even though this film goes on dry in most cases, it is good to have the temperatures above freezing for at least a day or two so that the adhesive can bond well to the glass. If it were a wet install, you would need 24 for 48 hours above freezing.